Manufacturing

Every manufacturing plant is different, but just like the rest of the UK, 90% of them could save CO2 and energy from Voltage Power Optimisation (VPO)®. In fact, with higher energy use across the board, and a greater proportion of inductive loads than an average site, the opportunity is perhaps greater in this sector than any other.