|
|
A powerPerfector improves energy efficiency by optimising the electrical supply voltage: saving energy, reducing cost, and carbon footprint. Also protects equipment against power surges and transients
|
|
|
-
|
|
|
Voltage Power Optimisation is the unique, proven technology only found in a powerPerfector. It optimises voltage...
|
|
|
Because of the colossal hidden cost to the entire UK arising from the discrepancy between the voltage needed to run electrical equipment at peak efficiency and the actual voltage that arrives on site...
|
|
|
The average saving a powerPerfected building makes is 13% but it can be as high as 20%. This is not in a few isolated cases...
|
|
|
Our technology is redefining electricity supply by optimising your power at source for the first time...
|
|
|
Our free and easy evaluation is there to show you, without any obligation, the fixed costs and guaranteed value of a powerPerfector installation...
|
|
|
powerPerfector was conceived, designed and manufactured with energy efficiency in mind. It is a completely passive unit, with no moving parts, made from ultra-high-purity materials which give it a 99.9% efficiency or higher...
|
|
|
Terms and Conditions for powerPerfector PLC
|
|
|
-
|
|
|
What does powerPerfector do?
powerPerfector is an all-in-one solution to a number of common power supply problems...
|
|
|
We guarantee that the overall savings level for your powerPerfector project will achieve a minimum of 80% of the predicted Return on Investment (ROI) percentage as quoted to you on your final cost/value page for a single installation, or the average of multiple installations...
|
|
|
The powerPerfector unit has the following primary functions...
|
|
|
Over 185,000 Voltage Power Optimisation units have been installed with no requirement for repair or replacement...
|
|
|
questions and answers about voltage optimisation and powerperfector
|
|
|
Our team of in-house engineers with over 50 years combined experience will project manage the installation of your powerPerfector from start to finish...
|
|
|
powerPerfector supply a range of models for all organisations; public and private, large and small
|
|
|
for complex sites powerPerfector are able to offer a fully IPMVP adherent evaluation. The key features of our approach to analysis are as follows...
|
|
|
|
|
|
Client case studies demonstrating the success of Voltage Optimisation with powerPerfector
|
|
|
Client case studies in the education sector demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
Greenshaw High Street Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
RLSB Dorton College Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Treorchy Comprehensive Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Greenshaw High Street Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
The University of Winchester Voltage Power Optimisation case study with powerPerfector unit installed...
|
|
|
Fairfield High School Case study on their VPO...
|
|
|
Greenshaw High Street Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Monifieth and Brechin High Schools Case study on their VPO...
|
|
|
Rhyl High Street Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Client case studies for Government Bodies demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
Ofgem - 9 Millbank Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
HM Prison Service, Cardiff Prison Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
DECC – Department for Energy & Climate Change, 3 Whitehall Place Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Defra: Nobel House Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
DFID case study with powerPerfector unit installed...
|
|
|
powerPerfctor works with the Government Office for the East Midlands...
|
|
|
powerPerfctor works with the Government Office for the East Midlands...
|
|
|
powerPerfctor works with the Veterinary Laboratories Agency to get powerPerfected...
|
|
|
Client case studies in the healthcare sector demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
Calderstones NHS Trust Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Gloucester NHS Trust
Cirencester Hospital Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Carlton Court
Hospital Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Client case studies for Hotels and Accommodation demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
The County Hotel - Chelmsford Voltage Optimisation case study with powerPerfector unit installed.
|
|
|
International Students House, London Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Littlecote House Hotel Voltage Optimisation case study with powerPerfector unit installed..
|
|
|
Down Hall - Country House Hotel Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Dakota Hotel - Voltage Optimisation case study with powerPerfector unit installed.
|
|
|
Handpicked Hotels Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Hilton Hotel Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Hilton Hotel Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Client case studies in the manufacturing sector demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
DS Smith Plastics - Worldwide Dispensers Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Good News Press, Essex Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Trelleborg Industrial AVS Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Kaysersberg Plastics, Gloucester Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Frederic Robinson's Breweries - Stockport Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Newly Weds Foods Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Caledonian Brewery Case study
|
|
|
Client case studies for Offices demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
Amey PLC is one the largest providers of support to the public sector, having recently received the green light from Birmingham City Council to upgrade the infrastructure network over the next 25years, has invested in Voltage Power Optimisation (VPO)® with brilliant results, saving 15% of their average kWh consumption.
|
|
|
Oxfordshire County Council - Speedwell House Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Winterthur Life, Dextra Court Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Royal Bank of Scotland - Lakeside Boulevard, Doncaster Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
University of Surrey - Clinical research Centre Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Case ...
|
|
|
Case ...
|
|
|
Amey PLC is one the largest providers of support to the public sector, having recently received the green light from Birmingham City Council to upgrade the infrastructure network over the next 25years, has invested in Voltage Power Optimisation (VPO)® with brilliant results, saving 15% of their average kWh consumption.
|
|
|
Amey PLC is one the largest providers of support to the public sector, having recently received the green light from Birmingham City Council to upgrade the infrastructure network over the next 25years, has invested in Voltage Power Optimisation (VPO)® with brilliant results, saving 15% of their average kWh consumption.
|
|
|
Foreign and Commonwealth Office Case study
|
|
|
Interserve Case study
|
|
|
Client case studies in the retail sector demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
Waterstone's - Gower Street Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
ASDA stores Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Burger King - Piccadilly Circus Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Tesco Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Waterstone's - Gower Street Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Our case ...
|
|
|
Prupim shopping centre Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Client case studies for areas of special interest demonstrating the success of Voltage Optimisation with powerPerfector...
|
|
|
RSPB, The Lodge Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Tower of London Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
The National Archives Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Celtic Manor Resort Clubhouse Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Aldeburgh Music Concert Hall Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
AMF Bowling Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
AMF Bowling Voltage Optimisation case study with powerPerfector unit installed...
|
|
|
Extract from Sustainable Development Commission "Sustainable Development in Government Report 2007"
|
|
|
powerPerfector offers VPO technology to EDF customers
|
|
|
all Voltage Optimisation case studies for powerPerfector download agea
|
|
|
Loans for energy saving equipment - Carbon Trust and Salix Financing
|
|
|
The Carbon Trust loan itself, worth between £5,000 and £200,000, is unsecured, interest-free, repayable over up to four years and has no application fee...
|
|
|
Contact details and location map for powerPerfector PLC Head office in London
|
|
|
Salix delivers interest free funding to accelerate investment in energy efficiency technologies across the UK public sector.
|
|
|
powerPerfector has a dedicated Partners Team serving the needs of third parties who advise their clients on energy efficiency...
|
|
|
powerPerfector has a dedicated Partners Team serving the needs of third parties who advise their clients on energy efficiency...
|
|
|
Latest news and events for powerPerfector...
|
|
|
powerPerfector in the press
|
|
|
A chance to look at this months edition of our powerPerfector newsletter, and a list of back-dated issues.
|
|
|
...backdated powerPerfector newsletters can can now be found here
|
|
|
Calendar of events, exhibitions and conferences for powerPerfector
|
|
|
A list of news for February 2012
|
|
|
The first UK manufactured powerPerfector Voltage Power Optimiser, leaves the production line this week.
|
|
|
The powerPerfector Energy Award highlights organisations and projects that have had a significant impact on energy use whether through energy efficiency or renewable generation.
|
|
|
powerPerfector, one of the UK’s leading ‘green tech’ companies, has been accredited by SAFEcontractor for its Health and Safety Management System.
|
|
|
A list of news for January 2012
|
|
|
With rising energy costs and the threat of the energy gap round the corner, it seems businesses in the UK are embracing green technology to cut cost and carbon.
|
|
|
A list of news for December 2011
|
|
|
MP Mark Field backs green tech company powerPerfector for manufacturing award
|
|
|
powerPerfector has continued to meet ISO 14001 standards and has been rewarded with an updated accredition.
|
|
|
The Board of powerPerfector Group is delighted to announce the appointment of Mike Carr as a non-executive director.
|
|
|
A list of news for November 2011
|
|
|
New financing options allow almost any organisation to adopt VPO.
|
|
|
powerPerfector, the UKs fastest growing green company has reached a significant milestone, having saved its clients 100 million pounds in energy spend.
|
|
|
A list of news for October 2011
|
|
|
London based energy efficiency company powerPerfector has completed the acquisition of the global IP, manufacturing and distribution rights to its cost and energy saving Voltage Power Optimisation (VPO)® technology from its Japanese supplier.
|
|
|
A list of news for September 2011
|
|
|
Kevin Hard, CEO of Nottinghamshire based company EvoEnergy Ltd, has been won the powerPerfector sponsored IoD Director of the Year for Environmental Leadership.
|
|
|
Green technology company powerPerfector has been pipped to the post on the annual Growth Business Top 50 Rising Stars of 2011 by Cupid an online dating agency – of all things!
|
|
|
A list of news for August 2011
|
|
|
powerPerfector has, for the second successive year, been named as a finalist in the prestigious National Business Awards, in partnership with Orange.
|
|
|
powerPerfector’s rollout of Voltage Power Optimisation (VPO)® across the Environment Agency’s estate has been shortlisted for a coveted Energy Award.
|
|
|
A list of news for July 2011
|
|
|
The UK’s fastest growing green company has reached a significant milestone, having saved its clients a billion kWh of energy.
|
|
|
A list of news for May 2011
|
|
|
Surrey Police joins some leading environmental organisations in installing the best practice technology including DECC, the Environment Agency and WWF.
|
|
|
A list of news for March 2011
|
|
|
powerPerfector helps NHS Trusts Breathe Easier
|
|
|
powerPerfector to sponsor environmental awards 2011
|
|
|
A list of news for February 2011
|
|
|
Following trials of electricity 'supply' management solutions the government agency has begun to roll out powerPerfector's Voltage Power Optimisation (VPO)® across its portfolio of 35 sites.
|
|
|
List of News - January 2010
|
|
|
powerPerfector saving energy above and beyond expectations for the NHS
|
|
|
powerPerfector help AXA continue on their path to sustainability
|
|
|
Leading by example, we are one of only a handful of organisations to receive the new BS EN 16001 standard in energy management
|
|
|
Building on our impressive track record, powerPerfector continues to win public sector tenders bringing Voltage Power Optimisation to those who need it.
|
|
|
Footprint Friends, to commemorate the WOW Awards and inspire the next year's participants, have released a DVD of the event, available from their website
|
|
|
List of News - December 2009
|
|
|
powerPerfector 33rd in Sunday Times 100 fastest growing companies
|
|
|
powerPerfector is the subject of an in depth case study on Voltage Power Optimisation by the Financial Times
|
|
|
List of News - November 2009
|
|
|
We are delighted to announce that we have been awarded ISO accreditation for both 9001 and 14001 recognising our commitment to the highest standards and processes.
It is now our intention to achieve 16001 for Energy Management so watch this space.
|
|
|
The WOW awards, sponsored by powerPerfector, were a resounding success with Canon Burrows taking home the prize and a powerPerfector unit for their school
|
|
|
powerPerfector sponsored the edie environmental excellence awards with Angus Robertson, CEO, presenting the prize to AEA
|
|
|
The installation of a powerPerfector unit is projected to save 69,500kg in carbon emissions every year
|
|
|
Swallowfield Plc are one of the leading providers of support for the beauty, personal care and household goods industries and have opted for voltage power optimisation to continue and further their plans for sustainable growth
|
|
|
The UK's conservative party has signed up to the 10:10 pledge; to cut their emissions by 10% by the end of 2010.
|
|
|
powerPerfector branches out into online media to educate on the CRC and further the message of energy savings through Voltage Power Optimisation
|
|
|
List of News - October 2009
|
|
|
powerPerfector has been presented with the prestigious ‘Best Innovation in Energy Management’ award at London’s Working Buildings 2009 Innovation Awards, held in Olympia on the 8th November
|
|
|
powerPerfector has been selected by the Eastern Shires Purchasing Organisation as a key provider and the sole supplier of Voltage Optimisation
|
|
|
powerPerfector is proud to announce that Voltage Power Optimisation has been chosen as the foundation of the Envirionment Agency's energy efficiency programme
|
|
|
List of News - September 2009
|
|
|
The National Archives hold over 1,000 years of our history but were concerned about their impact on the future. As part of our new initiative they have signed up to a fully compliant IPMVP analysis which is the only internationally recognised methodology for analysis of energy efficiency projects.
|
|
|
SALIX financing is a great way for the public sector to invest in a long term energy solution and at powerPerfector we can lead you through the entire process.
|
|
|
powerPerfector - hosting the best in environmental excellence.
|
|
|
Weston Sovereign Shopping Centre has been widely recognised for it's pioneering approach to energy efficiency. Even with those measures in place, there was still room for about 16% in additional energy savings just from Optimising their electrical supply.
|
|
|
Colchester Castle has always stood the test of time and now, with Voltage Power Optimisation, it's ready to face and contribute to a carbon free future.
|
|
|
Our masterclass are of real benefit for those looking to understand the difference between Voltage Power Optimisation and transformers.
|
|
|
The powerPerfector team - proud sponsors of Footprint Friends, has put it's weight behind the 'Million Feet to Copenhagen' campaign with considerable artistic license.
|
|
|
-
|
|
|
About powerPerfector...
|
|
|
powerPerfector Culture and Commitment -Ethics in practice...
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
questions and answers about voltage optimisation and powerperfector
|
|
|
As the proud sponsor of www.footprintfriends.com powerPerfector has made a commitment to taking an active role in supporting the climate change conversation for children...
|
|
|
The Green500 is the premier carbon mentoring service for large organizations based in London...
|
|
|
Jonathon Porritt talks about Voltage Power Optimisation (VPO)®
|
|
|
Jonathon Porritt talks about Voltage Power Optimisation
|
|
|
Carbon Reduction Commitment - EU Emissions Trading Scheme - The Climate Change Levy - Verdantix Report - OGC Report
|
|
|
The Carbon Reduction Commitment (CRC) is a cap and trade system aimed at reducing the impact the UK has on global warming...
|
|
|
In the CRC’s first year, the early action metric is the only factor by which carbon reduction can be measured. Let powerPerfector help your organisation achieve Carbon Trust accreditation...
|
|
|
The European Union Emissions Trading Scheme (EU ETS) is a trans-national cap and trade system aimed at reducing the EU’s impact on global warming...
|
|
|
By cutting back on your electricity consumption you can quantifiably reduce your carbon footprint, earning the Carbon Trust Standard...
|
|
|
Introduced on 1st April 2001, the Climate Change Levy (CCL) is in effect an energy tax on non-domestic, non-transport consumers...
|
|
|
powerPerfector provides quantifiable reductions in electricity consumption by very efficiently addressing with the electricity supply problem in the UK...
|
|
|
Carbon Reduction Commitment - EU Emissions Trading Scheme - The Climate Change Levy - Verdantix Report - OGC Report
|
|
|
Links ...
|
|
|
Links ...
|
|
|
-
|
|
|
powerPerfector sitemap shows all the pages on www.powerperfector.com
|
|
|
Contact details and location map for powerPerfector Ltd Head office in London
|
|
|
Contact details and location map for powerPerfector Ltd in Manchester
|
|
|
Leave your details or submit a question for a member of the powerPerfector team to get back to you...
|
|
|
powerPerfector will keep you updated with out latest news. Your details will not be passed to any third party.
|
|
|
Links ...
|
|
|
Follow us on Twitter!
|
|
|
jobs with powerPerfector
|
|
|
Contact details and location map for powerPerfector Ltd Head office in London
|
|
|
Use the this page to search for documents and pages on powerPerfector.com containing specific words or combinations of words.
|
|
|
A powerPerfector improves energy efficiency by optimising the electrical supply voltage: saving energy, reducing cost, and carbon footprint. Also protects equipment against power surges and transients
|
|
|
A powerPerfector improves energy efficiency by optimising the electrical supply voltage: saving energy, reducing cost, and carbon footprint. Also protects equipment against power surges and transients
|
|
|
|
|
|
The Carbon Trust loan itself, worth between £5,000 and £200,000, is unsecured, interest-free, repayable over up to four years and has no application fee...
|