Logo: Power Perfector, energy saving like no other
Our Clients'
savings
Up to today
kWh: 463,119, 042
CO2 kg: 251,936, 748
£: 387,768, 12

Links

Carbon Trust Loan
/Salix funding
pp installation

Related Downloads

Click here to download the acrobat PDF reader | powerPerfector brochure (PDF 4.7 MB) 
Download time approx. 24m 37s at 28 Kbps Download time approx. 12m 48s at 56 Kbps Download time approx. 5m 12s at 128 Kbps Download time approx. 1m 16s at 512 Kbps

You may need an Acrobat reader to read some of the PDF files above, click here to download the reader from Adobe
powerPerfector building

Installation 

powerPerfector is connected to the total electrical load, at its source in the facility’s electrical intake room, in series between the main switch and the distribution. No other connections are necessary.

Once powerPerfector is set up, no further adjustments are required and the unit will run 24 hours a day, 365 days a year. The unique  powerPerfector is the simplest and safest guaranteed way to reduce energy costs.

powerPerfector Integrated Contract Engineers

A team of in-house engineers with over 50 years combined experience will project manage the installation of your powerPerfector from start to finish.  We are proud that our team has been recruited from both industry and the armed forces, are qualified in PRINCE2 and will be happy to look after your installation in a non-combat environment.

The engineering team manage a UK wide network of experienced electrical contractors to undertake the site survey and installation.   All our contractors carry a minimum of £5million liability insurance.


Free Evaluation
Asda quote