Our free evaluation process
To find out
the
size of your opportunity to save
electricity, money and emissions you have 4 simply,
free steps to complete to
know accurately what the cost/value of a
powerPerfector
installation is at your site/s:
Four easy steps to energy saving
Step 1 - Please send us the following data,
which will remain confidential
A. The highest maximum demand in the last year for
each of the incoming supplies to your building (from this we size the unit
required)
B. The total kWh consumption for the last 12 months on
each incoming supply.
C. The cost of supply for the last 12 months including
CCL if you are not buying “Green” or your price per kWh for the next year.
Send
the data on any sites that you would like financially assessed, we will send
you an estimate of the installation cost/value of
powerPerfector
at your site, like the one here >
and email it back to you for your review before the next step.
Step 2 - If you like the numbers – we will
send you a logger.
The
voltage logger will be sent recorded delivery and you simply plug it into a
3 pin plug point for a week to measure your voltage profile, and return it
to us to analyse. We will send you your existing voltage profile and your
optimisation level with an amended calculator page, see example here
>
Step 3 - Next we need to survey the site.
If you are happy with the financials and wish
to go ahead we need to arrange for a contractor to survey your site and cost
the installation, so that we can give you the capped cost and estimated
savings.
Our terms and conditions state that in the
unlikely event that you are unhappy with the indicated ROI of the installation in
the first 3 months you will have all your expenditure refunded (to date
nobody ever has). Do not forget that if you are a S.M.E., with less than 250
employees, and meet the Carbon Trust’s loan approval criteria, you will
qualify for an interest free four year loan of up to £100,000 to buy and
install our technology.
We will put together a full proposal at this
stage, outlining what the technology is; the process that we have been
through to evaluate the costs, the opportunity for optimisation and the
savings. We will also include the terms and conditions, our guarantees,
insurances and also relevant case studies. The proposal is intended to act
as a full report that can be taken straight to the decision makers to
demonstrate the business case.
Step 4 - Installation
If your unit is held in UK stock we can
deliver immediately or if it needs to be ordered, delivery time is typically
8 to 12 weeks. Delivery and installation will be arranged at a time that
best suits your operational requirement and the unit can be installed by
either your preferred electrical contactor or a
powerPerfector
approved installation contractor.
Installation time varies with the size of the unit and will take anything
from 2hrs upwards with pre-cabling conducted first to minimise the required
shut down time.
We guarantee to save you money in line with our
ROI predictions on
your first
installation
or you can have all you expenditure back
provided
the decision is
made within 3 months.
powerPerfect
or waste energy