powerPerfector
installation
powerPerfector
is connected to the total electrical load, at its source, in the facility’s
electrical room, in series between the main switch and the 3 phase bus bar
system. There are no other connections necessary.
Once powerPerfector
is set-up there are no further adjustments required, and the unit will run 24
hours a day, 365 days a year. powerPerfector
is unique and is the simplest and safest guaranteed way to reduce energy costs.

powerPerfector
Integrated Contract Engineers
A team of in-house engineers with over 50 years combined experience will project
manage the installation of your powerPerfector from start to finish. Our team
has been recruited from the armed forces, are qualified in PRINCE2 and will be
happy to look after your installation in a non combat environment.
The engineering team manage a UK wide network of experienced electrical
contractors to undertake the site survey and installation. Equally if you have
approved contractor our engineering team will happily work with them and give
them the assistance and training required to do the job. All our contractors
carry a minimum of £5million liability insurance"
|