Voltage Optimisation®

 

 

 

|

|

|

|

|

|

|

          the product:
                 product range
                 proof of performance
                 Installaion
                 pP news
                 literature
          see also:     

          technical area:
                 why optimise

                 supply security
                 FAQs

Proof of performanceInternal arrangement of a medium size powerPerfector

powerPerfector was developed in Japan 12 years ago.  Over 300,000 units have been installed with no requirement for repair or replacement and the Japanese government provide businesses grants of up to 30% to buy the technology.  Similar success and reliability is evident in the numerous installations in the UK.

  1. DS Smith Plastics Worldwide Dispensers; 3 units at -7%, -8%, -8% optimisation settings; 21% saving

  2. HM Prison Cardiff; 8% optimisation; 13.5% saving

  3. Rochdale Central Leisure centre; 9% optimisation; 17% saving

  4. Tate Gallery storage facility; 7% optimisation; 12.9% saving

  5. Wigan Metropolitan Borough Council; 2 units at 9% optimisation settings; 18.9% saving

  6. Environmental Technology Centex at Nottingham University; 7% optimisation; 11.6% saving

  7. Wycombe District Council; 9% optimisation; 20.2% saving

  8. Queen Mary University; 7% optimisation; 15.9% saving

  9. Trelleborg IAVS; 8% optimisation; 12% saving

  10. Tesco 90 installations: savings in excess of 11%

  11. Land Registry 24 sites with savings of: 12-13%

Once a powerPerfector unit has been installed, electrical energy consumption on the site will be reduced, with an associated reduction in maximum demand and base load.  As part of the service offered by powerPerfector, a report will be produced showing these savings once eight weeks have elapsed since the installation.

 

To carry out this analysis, we require access to the site’s half-hourly data.  This is typically provided by the utility company that supplies the electricity, and can be requested by phone or email.  Alternatively, powerPerfector can request this data on behalf of a customer if they have an email giving authorisation.

 

Electricity bills are based on the half-hourly data readings, which form the basis of the analysis.  So a 13% reduction in average half-hourly kWh consumption is also an effective 13% reduction in electricity costs!

 

Every site is different, so the methodology used will vary from one analysis to another.  But essentially the object is to compare electricity consumption since the powerPerfector was installed to the period before installation.  If energy use is highly variable, perhaps because it is very sensitive to changes in temperature or some other factor, it is sometimes necessary to normalise the data in order to compare like with like.  The analysis process will be explained fully, and powerPerfector are happy to respond to any questions regarding the analysis methods used.

 

Once an analysis has been completed we will ask your permission to use your site as a case study, and may ask for a quotation from you about your experience with powerPerfector.


Proven Savings or Money Back

 
Latest News ...

 

Download our latest
literature & brochure  ...

 

Energy Institute:  Voltage Optimisation® explained

 

Carbon Trust  interest free loans

 

Public sector matched funding

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 |      home       the product   | case studiesfree evaluation |   tech. & FAQs    |    contact us      |  terms & conditions   |